|
| |
Wrenches – 7/16, 9/16 and 10mm |
Sockets 7/16, 3/8 and 5/16 |
| |
Drill |
Drill adapter for socket attachment |
| |
Drill bits 1/4 and 3/8 inch |
Pliers |
| |
Level and tape measure |
Hack Saw |
| |
Welding is the recommended method of securing the linear actuator mounts to the gate and hinge post. Bolt on brackets are provided and are acceptable but may require frequent service to keep tight. They must be very securely attached (i.e. carriage bolts with lock nuts and washers). Lag type bolts are not recommended. Loose or unstable linear actuator mounts will result in improper operation.
|
| IMPORTANT CAUTIONS: |
| 1. |
Do not perform any welding with the actuator cable plugged into the control board or the battery connected. Serious damage to the control board and/or battery may occur if attempted. |
| 2. |
Use control box as a template to determine mounting screw locations and then attach screws and slide on control box. Do not attempt to hold control box and drill mounting holes this could damage the preinstalled components. |
| 3. |
Always disconnect the battery power from the control board using the Plug N Go harness prior to wiring any devices to the control board. |
|